Skip to content
  • QUOTE
  • 888.653.3333
  • info@safti.com
  • Products
    • Fire Protective Glass Tested to NFPA 252/257, UL 9/10C, ULC S104/S106; Blocks smoke and flames.
    • SuperLite® I
    • SuperClear® 45-HS
    • SuperClear® 45-HS-LI
    • SuperLite® I-XL
    • SuperLite® I-XL IGU
    • SuperLite® X-45/60/90
    • SuperLite® II-XL 45
    • Ceramics
    • Fire Resistive Glass Tested to ASTM E119 / UL 263 / ULC S101; Blocks smoke, flames and radiant heat.
    • SuperLite® II-XL 60
    • SuperLite® II-XL 90
    • SuperLite® II-XL 120
    • SuperLite® II-XLB 60
    • SuperLite® II-XLB 120
    • SuperLite® II-XLM 60
    • SuperLite® II-XLM 120
    • SuperSecure® II-XLS 45-120
    • Fire Rated Walls 60-120 minute fire resistive glass and frame assemblies tested to ASTM E119 / UL 263 / ULC S101.
    • GPX® Architectural Series Fire Resistive
    • GPX® Curtain Wall
    • GPX® Hurricane
    • GPX® Ballistic
    • GPX® Blast System
    • GPX® EZ Frame
    • Fire Rated Doors Full vision 20-45 minute fire protective doors and 60-90 minute temperature rise doors tested to NFPA 252 / UL 10C / ULC S104.
    • GPX® Architectural Series Fire Protective
    • GPX® Architectural Series Fire Resistive
    • GPX® Builders Series Fire Protective
    • GPX® Builders Series Temperature Rise
    • GPX® Hurricane
    • GPX® Ballistic
    • GPX® Vision Kit
    • Fire Rated Openings 20-45 minute fire protective glass and framing assemblies tested to NFPA 257 / UL 9 / ULC S106.
    • GPX® Architectural Series Fire Protective
    • GPX® Builders Series Fire Protective
    • GPX® EZ Frame
    • Fire Rated Floors 60-120 minute fire resistive glass floor assemblies tested to ASTM E119 / UL 263 / ULC S101.
    • GPX® FireFloor
    • Fire Rated Fences 20-60 minute fire rated glass fence for WUI areas or designated fire zones.
    • SAFTI FENCE
  • Literature
  • Specs
  • Details
  • Learn
    About Us
    Videos
    Case Studies
    Articles
    Blogs
    Continuing Education
    Literature
    BIM Library
    Industry Links
    Press Releases
    Testimonials
    Technical Bulletins
    Newsletters
    Product Selector
  • Gallery
  • Reps
  • Contact
  • Products
    • Fire Protective Glass
    • Fire Resistive Glass
    • Fire Rated Walls
    • Fire Rated Doors
    • Fire Rated Openings
    • Fire Rated Floors
    • Fire Rated Fences
  • Literature
  • Specs
  • Details
  • Learn
    • About Us
    • Product Selector
    • Articles
    • Blogs
    • BIM Library
    • Case Studies
    • Newsletters
    • Press Releases
    • Continuing Education
    • Literature
    • Technical Bulletins
    • Testimonials
    • Industry Links
    • Videos
  • Gallery
  • Reps
  • Contact
Menu
  • Products
    • Fire Protective Glass
    • Fire Resistive Glass
    • Fire Rated Walls
    • Fire Rated Doors
    • Fire Rated Openings
    • Fire Rated Floors
    • Fire Rated Fences
  • Literature
  • Specs
  • Details
  • Learn
    • About Us
    • Product Selector
    • Articles
    • Blogs
    • BIM Library
    • Case Studies
    • Newsletters
    • Press Releases
    • Continuing Education
    • Literature
    • Technical Bulletins
    • Testimonials
    • Industry Links
    • Videos
  • Gallery
  • Reps
  • Contact

Newsletters

Innovations in Fire Rated, Temperature Rise Glass Doors (December 2018)

Innovations in Fire Rated, Temperature Rise Glass Doors

Hard to believe, but there was once a time when adding a small piece of wire or ceramic glass in a fire rated door was considered new or even innovative because it allowed for vision as well as fire protection.  Fast forward to today where the IBC has imposed significant limitations to wire, ceramics and all fire protective glazing used in doors rated over 45 minutes.  With 80% of the states adopting the 2012 and 2015 IBC, this size limitation on fire protective glass in 60-90 minute temperature rise glass doors becomes more pronounced because the code limits their size to 100 sq. inches regardless if the building is fully sprinklered.  With designers and building occupants demanding maximum views in their fire doors, the glazing products used in these doors had to evolve as well to meet the code requirements.

Increasing transparency with the help of fire rated glazing is easy to accomplish in 20 and 45 minute doors, where the door is expected to only compartmentalize smoke and flames.  However, in 60 and 90 minute doors that are required to compartmentalize smoke, flames and limit the heat transfer on the non-fire side, this is more challenging.  Known as temperature rise doors, these doors carry a temperature rise rating in addition to the hourly fire rating.

Temperature rise ratings for fire doors are either 250 degrees F, 450 degrees F or 650 degrees F, indicating the maximum rise above ambient temperature on the non-fire side measured during the first 30 minutes of the fire endurance test.  In both the UL 10C and NFPA 252 test standards, thermocouples are placed on specific points on the door:

UL 10C Section 6.2.  Unexposed surface temperatures shall be taken at no less than three points, with a minimum of one thermocouple each in 16-ft2 (1.5 m2) area of the door.  Thermocouples shall not be placed over reinforcements extending through the door, over the glass panels, or nearer than 12 in. (305 mm) from the edge of the door.

NFPA 252 Section 4.3.1.1. Thermocouples shall not be located over reinforcements extending through the door, over vision panels, or within 305 mm (12 in.) of the edge of the door.

Temperature rise doors rated 60-90 minutes are typically made of steel with an opaque, insulating core to limit heat transfer. Where glazing is incorporated, it is usually a fire protective product that is limited to 100 sq. inches to limit the passage of heat through the glass.  Typically, wire or ceramic in limited sizes have been used due to their stability and capability to withstand the hose stream in this small size even though these products has no ability to block radiant heat.

Adding glazing in excess of 100 sq. inches to 60-90 minute temperature rise doors was impossible until the introduction of fire resistive glazing tested to ASTM E-119/UL 263/NFPA 251.  This type of glazing is capable of limiting the temperature rise on the non-fire side to less than 250 degrees F.  While temperature rise doors are not exactly new, having full-vision door lites incorporated in the door assembly is relatively new, and is still considered a niche or specialty product.  There are many door manufacturers that offer opaque temperature rise doors or with a 100 sq. inch vision lite as a commodity product.  In contrast, there are only a handful of manufacturers that offer temperature rise doors with full vision glazing because of the unique challenges that it can present.

Size and Weight Considerations – and Design Opportunities

The obvious challenge is the thickness and weight of using fire resistive glazing.  There are 2 options available in the market today that meet the ASTM E-119/UL 263/NFPA 251 requirement – one is a tempered fire resistive unit and the other is an annealed multilaminate.

For 60 minutes, the tempered fire resistive units are at 1-1/8” / 9 lbs. per square foot, while the annealed multilaminates start at 7/8” / approx. 11 lbs. per square foot.  At 90 minute ratings, the tempered fire resistive units are at 1-1/2” / 12 lbs. per square foot, while annealed multilaminates start at 1-7/16” / approx. 18 lbs. per square foot.  If you are looking to have full-vision in a 3 ft. wide x 7 ft. high 90 minute temperature rise door for example, the weight of the glass can over 200 lbs.  If the door and hardware are not properly engineered to tested with these weights, it will an issue.

Using a fire rated glass and framing manufacturer that offers fully listed and labeled glazed door assemblies is critical at these higher ratings. Today, 60-90 minute temperature rise doors are available up to 10 ft. high, with multiple fire rated hardware options and finishes.  The technology on fire rated doors has improved so much in the last 10 years that hardware manufacturers are offering more fire rated hardware options to accommodate the size and weight that these doors may impose without necessarily compromising on design.

Fire Resistive Butt-Glazed Stairwell with SuperLite II-XLM with GPX Architectural Series Perimeter Framing (Walls) and GPX Architectural Series Doors with SuperLite II-XL
These 9-ft high 60 minute temperature rise pair doors matches the height of the adjacent 1-hour butt-glazed wall at the University of Wisconsin School of Business Learning Commons in Madison, WI. This eliminates the need to add a transom to the door assembly, which appealed to the architect.

Before, steel temperature rise doors with a painted finish was the only available choice.  Today, designers can choose between anodized finishes, stainless steel, wood veneer, brass, and more. All of these developments allow designers to have a clear view door with sleek and elegant aesthetic while meeting the temperature rise requirements of the project.

SuperLite II-XL 120 with Starphire Low-Iron Glass in GPX Curtain Wall Framing; SuperLite II-XL 90 with Starphire Low-Iron Glass in GPX Architectural Series Aluminum Doors
90-minute temperature rise pair doors with a clear anodized finish at Harvard Business School’s Klarman Hall in Boston, MA.
SuperLite II-XL 90 in GPX Builders Series TR Doors and SuperLite II-XL 120 in GPX Architectural Series Walls. All with staintless steel finish.
90 minute temperature rise pair doors with stainless steel finish at CUNY School of Law in Long Island City, NY.
90-Minute Temperature Rise Pair Door Asembly
90 minute temperature rise pair doors with a wood veneer finish at the Reid Hospital in Richmond, VA.

Multi-tasking Door Assemblies

In addition to aesthetics, full-vision fire rated glass doors have also evolved to perform multiple functions in one assembly.

For example, there are fire rated, temperature rise doors that provide hurricane performance as well.  Other than meeting fire and temperature rise requirements up to 90 minutes, these doors are tested to TAS 201, 202 and 203 and have complete Florida Product Approvals, Texas Department of Insurance Approval and UL Certifications.

90-Minute GPX Hurricane door and glass in Florida | SAFTI FIRST
90 minute, temperature rise and hurricane rated pair doors at the Las Olas Beach Club in Ft. Lauderdale, FL.

Fire rated, temperature rise doors up to 90 minutes with ballistic performance are also available.  Today, there are full vision fire rated doors that meet UL 752 Level 1, 2 and 3.  Higher ballistic ratings can be engineered depending on the requirement. In those cases, it is best consult with the manufacturer early in the project phase.

Temperature Rise and Ballistic Door at Private Office | SAFTI FIRST
60 minute, temperature rise and ballistic rated pair doors for a private office in San Francisco, CA.

Other additional performance options include forced entry, acoustic, privacy, and more.  For those architects looking exercise their creativity, decorative options on the glass and the door are also available.

Indeed, fire rated temperature rise glass doors have come a long way.  As designers and building owners continue to demand better performance and aesthetics, fire rated glass and framing manufacturers will continue to offer innovative products that can meet or exceed their expectations while maintaining full code compliance. Always check the listing and testing of these specialty doors for a trouble-free project.

Share:
PrevPrevious NewsletterFire Rated Glass in Unique Applications (September 2018)
Next NewsletterBest Practices for Specifying 45 Minute Fire Protective Glazing (March 2019)Next

Engineering. Design. Code.

Whether you’re looking for fire-rated walls, doors, openings, floors or a specialty service, we have the solution for you. With over 40 years of experience in testing, innovating, and providing technologically advanced fire-rated glass and framing products, we deliver unyielding performance and quality at a competitive price.

Let's Talk!

  • 888.653.3333
    (English)
  • 888.653.3333 ext. 652
    (Spanish)
  • info@safti.com
  • Representative Map
Address
Corporate
100 N Hill Dr, Ste12, Brisbane, CA 94005
Factory
220 S R Street, Merced, CA 95341
Contact
Phone
888.653.3333 - English
888.653.3333 ext. 652 - Spanish
Fax
888.653.4444
Email
info@safti.com

Sign up for our Newsletter!

Get notified of industry updates and new product alerts.

© 2023 SAFTI FIRST. All rights reserved.​
Disclaimer & Privacy Policy | Cookie Policy
Instagram Twitter Linkedin Facebook Youtube Vimeo
Suggested Pages
Case Studies
Request a Quote
SuperClear® 45-HS-LI
Continuing Education
Request a Quote
Continuing Education
Videos
SuperClear® 45-HS-LI
Case Studies
This website uses cookies to ensure you get the best experience on our website.

This website uses cookies to ensure you get the best experience on our website.


This website uses cookies to improve user experience. A cookie file is stored in your web browser and allows the website to recognize you and make your next visit easier and the website more useful to you. By using our website, you consent to all cookies in accordance with our Cookies Policy. Learn more.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage vendors Read more about these purposes
View preferences
{title} {title} {title}